 |
 |


 |
 |
 |
6950 SW 111th Ave. |
|
Beaverton, OR 97008 |
|
U.S.A. |
|
(503) 646-3399 |
|
(503) 627-0888 |
|
 |
 |
Flow Diagram: Pre-flux
Regeneration Systems

Step 1 Beta's Pre-Gen system adjusts
pre-flux solution pH and specific gravity while converting dissolved iron
into a filterable, solid form. An air driven diaphragm pump feeds the
Reactor where ORP is monitored and adjusted.
Step 2 The pre-flux solution is then
pH adjusted and controlled prior to entering the Settling Tank. The iron and
other suspended solids settle to the bottom of the tank for removal.
Step 3 The pre-flux solution then
enters a filter before returning to the Pre-flux Tank. |