Home | Products | Plant Design | Spare Parts | Locations | About Us | Chinese 首页

How It Works
Flow Diagram
Photo Gallery
Specifications
Proposal
6950 SW 111th Ave.
Beaverton, OR 97008
U.S.A.
(503) 646-3399
(503) 627-0888

Installation Options:  Sulfuric Acid Recovery System

galvanizing

steel wire/rod

steel wire/rod, Cascading

Footprint and Elevated Views of Systems

1-cell system, elevated

1-cell system, footprint

2-cell system, elevated

2-cell system, footprint

3-cell system, elevated

3-cell system, footprint

4-cell system, elevated

4-cell system, footprint

(low temp system) small system, footprint

(low temp system) small system, elevated

(low temp system) mid-size system, footprint

(low temp system) mid-system, elevated

(low temp system) large system, footprint

(low temp system) large system, elevated

 

© Beta Control Systems, Inc.  All rights reserved.

last updated June, 2005